1. You should start immediately and keep a running total according to work packages, etc.
|
|
2. You should collect cost information by work package as in the step above.
|
|
3. It is very important that the rate of work (slope) of the middle of the curve be at least as steep as originally planned. It is OK to stumble out of the gate but you had better make sure that you get caught up early.
|