Linear Model
 

Linear Model

  • Introduction
    This module describes how to use a linear approximation of the combined sets of S-Curves to determine current project status with respect to the schedule and budget. It also recaps possible counter-measures for the four possible general situations.
  • Instructional Objectives
    Given a set of As-Planned and As-Built (to date) construction project control data points, be able to determine:
    • Current Schedule and Budget Variances for a simple work package
    • Probable Schedule and Budget variances at the completion of the work package
    • Determine adjustments in work and expenditure rates to complete the work as planned
  • Student Materials
    Please select the desired format from among these:
    HTML
    / PDF / PPT
  • Instructor Guide
    Word


 

 

 