FNotice that by increasing (or decreasing) the availability of a scarce resource (hours or total number of errors allowed) the straight line (representing the constraint) moves in parallel to the original one (but note that the slope does not change)
FAlso note that the total-errors constraint is a non-binding constraint. That is, it does not impact the current optimal solution. (at what point is this no longer true?)