|
Time Value of Money II
- Introduction
This module discusses an economic basis to evaluate engineering projects with specific focus on simple interest, compound interest, leasing equipment and equivalent present value.
-
Instructional Objectives
- Describe the concept of equivalence as applied to cash flow diagrams;
- Understand the difference between Compound and Simple interest
- Define Present Value
- Define Future Value
- Student Materials
Time Value of Money II (PPT)
- Instructor guide
Guide (DOC)
- Reading Assessment
- Assignment
- Case Study
|
|
|
![](../../../Templates/images/spacer.gif) |
![](../../../Templates/images/spacer.gif) |
© 2001 Foundation Coalition. All rights reserved. Last modified
|
![](../../../Templates/images/spacer.gif) |
|
|